On Site Filing of Securing a Certificate of Occupancy (Highly Technical Application)

Classification: Highly TechnicalTotal Processing Time: 14 days, 2 hours, 22 minutesTotal Fees: Php 360.00 + Occupancy permit fees (based on PD No. 1096)

Covers on-site application for a Certificate of Occupancy under PD 1096 (the National Building Code of the Philippines) for Highly Technical structures — including commercial and market buildings exceeding 9 storeys, hospitals and mental health facilities, large public assembly buildings, disaster-response structures, and special structures such as aerodromes, historical buildings, wind turbines, and towers.

Who May Avail

All

Requirements

RequirementsWhere to Secure
Notarized Unified Application Form for Certificate of Occupancy, duly accomplished, signed and sealed over printed names by licensed Architect or Civil Engineer (full-time supervisor or inspector of construction) (5 original copies)Business One-Stop-Shop (BOSS) Office (CEO 2)
Notarized Certificate of Completion (NBC Form No. B-10), duly accomplished, signed and sealed by the full-time supervisor or inspector of construction, design professionals, and supervisor of specialty works. Note: if the construction was undertaken through a contract, the Certificate of Completion shall be signed by the Contractor/Authorized Managing Officer.Business One-Stop-Shop (BOSS) Office (CEO 2)
Construction Logbook with Certification, signed and sealed by the full-time supervisor or inspector of constructionLicensed Architect or Civil Engineer (full-time supervisor or inspector of construction)
Zoning Clearance (from Zoning Officer that the building has complied with the Locational/Zoning of land use)Business One-Stop-Shop (BOSS) Office (CEO 2)
Complete set of plans prepared, signed and sealed over printed names of the duly licensed and registered professionals with the conformity of the owner (4 Sets): a. Architect, in case of Architectural plans and documents; b. Civil Engineer, in case of Civil/Structural plans and documents; c. Professional Electrical Engineer, in case of Electrical plans and documents; d. Professional Mechanical Engineer, in case of mechanical plans and documents; e. Sanitary Engineer, in case of sanitary plans and documents; f. Sanitary Engineer, in case of sanitary plans and documents; g. Master Plumber, in case of plumbing plans and documents; h. Electronics Engineer, in case of electronics plans and documentsDesign professionals
Photocopies of valid IDs: Licenses of all involved professionals (Professional Tax Receipt for the current year & valid PRC ID, 1 photocopy, signed and sealed); Community Tax Certificate for the current year and valid ID of the applicant (1 photocopy)All professionals involved in the project
Photographs of the completed structure/building showing front, sides, and rear areas (1 set, colored copy)Owner
Tax Declaration of the Building (1 original copy, 3 photocopies)City Assessor's Office
Issued Building Permit with ancillary permit forms (1 photocopy)Owner
Fire Safety Inspection Certificate (FSIC), Endorsement and receipt issued (1 original copy, 3 photocopies)Bureau of Fire Protection Office
Assessment of Occupancy Permit Fees (1 original copy, 3 photocopies)Business One-Stop-Shop (BOSS) Office (CEO 2)
Receipt of Certificate of Occupancy (1 original copy, 3 photocopies)City Treasury Office – Window 4, 5, 6, 7

Step-by-Step Process

  1. Submit accomplished application form and required documents at Business One-Stop-Shop (BOSS) Office (CEO 2)

    Agency Action

    1. Review the submitted documents and attach checklist of requirements and evaluation checklist

      Fee: None · Processing Time: 1 hour · Administrative Assistant III (Alternates: Administrative Aide, Construction and Maintenance Man, Administrative Assistant II, Administrative Assistant VI)

  2. No action required from the client at this step.

    Agency Action

    1. 1.Conduct evaluation of plans and documents submitted – Land Use & Zoning

      Fee: None · Processing Time: 2 days · Zoning Administrator Designate (Alternates: Zoning Officer I, Architect II)

    2. 2.Conduct evaluation of plans and documents submitted – Line & Grade

      Fee: None · Processing Time: 1 day · Engineer II (Alternates: Engineer III)

    3. 3.Conduct evaluation of plans and documents submitted – Architectural

      Fee: None · Processing Time: 1 day · Supervising Administrative Officer (Alternates: Architect III, Architect II)

    4. 4.Conduct evaluation of plans and documents submitted – Civil/Structural

      Fee: None · Processing Time: 1 day · Acting Assistant City Building Official (Alternates: Engineer III, Engineer II)

    5. 5.Conduct evaluation of plans and documents submitted – Plumbing

      Fee: None · Processing Time: 1 day · Architect II (Alternates: Zoning Officer I, Administrative Assistant III)

    6. 6.Conduct evaluation of plans and documents submitted – Electrical

      Fee: None · Processing Time: 1 day · Engineer III (Alternates: Engineer I)

    7. 7.Conduct evaluation of plans and documents submitted – Sanitary

      Fee: None · Processing Time: 1 day · Acting City Building Official or Acting Assistant City Building Official

    8. 8.Conduct evaluation of plans and documents submitted – Electronics

      Fee: None · Processing Time: 1 day · Acting City Building Official or Acting Assistant City Building Official

    9. 9.Conduct evaluation of plans and documents submitted – Mechanical

      Fee: None · Processing Time: 1 day · Acting City Building Official or Acting Assistant City Building Official

    10. 10.Schedule and conduct inspection and verification

      Fee: None · Processing Time: 1 day · Inspectorate Team

    11. 11.Assessment of plans for order of payment

      Fee: None · Processing Time: 1 day · Administrative Assistant III

    12. 12.Review and print order of payment

      Fee: None · Processing Time: 1 hour · Supervising Administrative Officer (Alternates: Architect II, Engineer II, Architect III, Engineer III, Zoning Officer I)

    13. 13.Sign for approval of order of payment

      Fee: None · Processing Time: Not specified in the Citizen's Charter · Acting City Building Official (Or Acting Assistant City Building Official, Or Supervising Administrative Officer)

    14. 14.Prepare and print fire endorsement, if needed

      Fee: None · Processing Time: 5 minutes · Construction and Maintenance Man (Alternates: Administrative Assistant III, Administrative Assistant VI)

    15. 15.Sign fire endorsement

      Fee: None · Processing Time: Not specified in the Citizen's Charter · Acting City Building Official (Or Acting Assistant City Building Official, Or Supervising Administrative Officer)

  3. Proceed to City Treasury Office for the payment of fees and present the official receipt at Business One-Stop-Shop (BOSS) Office (CEO 2). Make sure to secure the Official Receipt that will be issued upon payment.

    Agency Action

    1. Accept the payment based on the Order of Payment

      Fee: Documentary Stamp Php 30.00; ICT Fee Php 25.00; Inspection & Verification Php 200.00; Zoning Certification Php 105.00; Occupancy Permit fee based on the assessment of fees · Processing Time: 2 minutes · City Treasury Office Staff

  4. No action required from the client at this step.

    Agency Action

    1. 1.Issue approved Zoning Certification

      Fee: None · Processing Time: 10 minutes · Zoning Administrator Designate (Alternates: Zoning Officer I, Architect II)

    2. 2.Prepare the necessary documents of permit for the approval of Building Official

      Fee: None · Processing Time: 2 days · Administrative Assistant VI (Alternates: Construction and Maintenance Man, Administrative Aide)

    3. 3.Approve the permit

      Fee: None · Processing Time: Not specified in the Citizen's Charter · Acting City Building Official (Or Acting Assistant City Building Official)

  5. Client gets the approved permit and signs in the Occupancy Permit Logbook at Business One-Stop-Shop (BOSS) Office (CEO 2)

    Agency Action

    1. Release the approved permit to client

      Fee: None · Processing Time: 5 minutes · Administrative Assistant III (Alternates: Administrative Aide, Construction and Maintenance Man, Administrative Assistant II, Administrative Assistant VI)

Offices Concerned

City Engineering Office